For manufacture wall panel,economizer.reheater ,super heater and steam pipeline of boilers.
Standard
|
Material Grade
|
GB/T3087
|
10#,20#,
|
GB/T5310
|
20G, 25MnG, 15MoG, 15CrMoG, 12Cr2MoG, 12Cr1MoVG
|
ASME SA106M
|
GR.B,GR.C
|
SA192M
|
SA-192
|
ASME SA213M
|
T1,T5,T9,T11,T12,T22,T91
|
ASME SA209M
|
SA-209-T1a
|
ASME SA210M
|
SA 210-A1/SA 210C
|
JIS 3461
|
STB 340,STB 410
|
EN 10216-2
|
P195GH,P265GH,13CrMo-5,10CrMo9-10
|
DIN 17175
|
St35.8,st45.8,15Mo3,10CrMo910,14MoV63,12Cr1MoV
|
1.Dimension
Diameter: 114MM-630MM
Thickness: 4MM-50MM
Length: according to your requirements
Specification: 114-630MM*4-50MM
2.Standard:
GB3087 Seamless steel tubes for low and medium pressure
GB 5310-95 Seamless steel tubes and pipes for high pressure boiler
ASME SA 192M,seamless carbon steel boiler and super heater tubes for
high-pressure service
ASME SA 209M,Seamless,carbon-molybde-num alloy-steel,boiler and super heater tubes
ASME SA 210M,Seamless Medium-carbon Steel Boiler and super heater tubes.
ASME SA 213M,Seamless ferritic and austenitic steel boiler,super heater and
heat-exchanger tubes
ASME SA 106M Seamless carbon steel for high temperature service
ASTM A179 seamless cold-drawn low-carbon steel tubes For Tubular Heat
exchangers,condensers,and Similar Heat transfer apparatus.
3.Description:
1) Heat Treatment: Normalizing+ temper;
2) Continuous Stenciling If You Require;
3) Antirust, Lubricating Treatment;
4) Adding Plastics in both sides;
5) Bale Into Hexagon, Max 2000 Kg/Bundle, Strengthening With Reinforcing Rod;
6) Smooth Surface, Mechanical Properties equilibrium, Tightness Tolerance
4.Optional Information
- Payment : T/T, L/C
- Delivery : 30 days
- Origin : China
- Minimum Order : 3 tons
- Packaging : in bundles
- Inspection : LR,BV,SGS
- Samples : Free
5.Main market: Singapore,Indonesia,Ukraine,Brazil,Korea,Thailand,USA,UK,Canada,Saudi Arabia,Ireland,Oman,Russia,Spain,South Africa,Vietnam,Peru,UAE,Bangladesh,France,Germany,etc.
6.Application
Our boiler steel pipes are widely used to manufacture heating pipelines, containers, and steaming pipelines of low or medium pressure boilers (P < 5.88Mpa, T < 450℃), and coal-saving devices, superheaters and preheaters of high pressure boilers (P > 9.8Mpa, 450℃ < T < 650℃).
7.Ordering information
Supply ability: 20000T/Month
Standard package: In bundles or bulk pack or according to your requirements
Minimum order quantity: 10 tons or by mutual consultation
FOB Price: Competitive prices
Loading port: Tianjin, Shanghai, Qingdao